Germany’s biomethane auction for electricity generation: higher support, too few projects—and an uncertain future

Germany’s latest biomethane auction secured 6.033 MW across three successful bids—just 28.9% of the reduced auction volume and 2.0% of the original 300 MW allocation. The results, announced by the Bundesnetzagentur on 29 September, show that a higher support ceiling has not yet rebuilt a substantial project pipeline.[1]

The proposed abolition of dedicated biomethane auctions under the government’s EEG 2027 bill introduces uncertainty over future support arrangements, potentially weakening investor confidence in new biomethane-fired power projects.[2]

Fig. 1 · September 2026 round From a 300 MW allocation to 6.033 MW awarded
Original allocation
300 MW
Volume offered
20.887 MW
Capacity awarded
6.033 MW
3Successful bids
28.9%Of the reduced volume
2.0%Of the original allocation
23.12Avg award, ct/kWh

Source: Bundesnetzagentur, results announced 29 September 2026 [1]. Award volumes, not commissioned capacity.

It is not, by itself, proof that biomethane-fired generation has no role—or that a higher subsidy is necessarily the answer.
limited supported running hours, uncertain supplementary revenues, fuel-contract exposure, permitting barriers and an increasingly uncertain future support route.
An auction can select investable projects. It cannot manufacture an investable pipeline simply by announcing more megawatts—or make the underlying problem disappear by announcing fewer.

It purchases electricity-generation capacity—not biomethane production

The dedicated auction, introduced in 2021 under Germany’s Renewable Energy Sources Act, or EEG, supports electricity generated using biomethane. Auction volumes are expressed in electrical capacity, and bid prices refer to electricity—not the energy content of the gas purchased.[3]

What it is

Support for electricity generated using biomethane, auctioned as electrical capacity and priced per unit of electricity.

What it is not
×A production subsidy for upgrading biogas ×A gas-injection tariff ×An obligation on suppliers to purchase renewable gas

How projects enter and win

>150 kWEligible new plants
4 weeksPermits in place before deadline
Pay-as-bidAward pricing
20 yearsSupport period
42 monthsTo enter operation

The auction route applies to eligible new plants above 150 kW. Plants must first enter operation after receiving an award, and the required permits and registration must generally be in place four weeks before the bidding deadline. These requirements favour more advanced projects over early-stage proposals.[4]

Developers bid an electrical capacity and a support reference price. Eligible bids are ranked from lowest to highest price, and awards are made on a pay-as-bid basis: successful projects receive their own bid value rather than a single clearing price shared by all winners.[5]

The support period is generally 20 years. Under the current biomethane provisions, an award normally expires if the plant has not entered operation within 42 months of the public announcement. An auction award therefore establishes a conditional support entitlement.[6]

The winning price is not an additional payment on top of all electricity revenue

The bid establishes the anzulegender Wert: the reference value used to calculate the EEG market premium. For these new projects, the simplified calculation is:

Market premium = winning reference value minus the annual wholesale-market benchmark, with a minimum of zero.

The plant sells its electricity and receives the applicable premium. It can improve its revenue by generating when its realised selling price exceeds the benchmark.

Fig. 2 · Payment mechanism, illustrative The premium tops the benchmark up to the reference value; selling above the benchmark is upside
Reference value {{ refLabel }}
Selling at the benchmark{{ total1 }} ct/kWh
Selling in higher-value hours{{ total2 }} ct/kWh
0 10 20 30 40
ct/kWh
Wholesale benchmark Realised price above benchmark EEG market premium
{{ premLabel }} ct/kWh market premium {{ readout }}

Illustrative. Reference value set to {{ refNote }}. Benchmark and realised-price levels are hypothetical; flexibility and heat revenues are excluded.

Eligible plants also receive a separate flexibility payment of €100 per kW of installed capacity per year, subject to performance and other conditions. Heat sales can provide another revenue stream where the project has a viable heat customer. The investment case therefore depends on several components, not the auction price alone.[7]

The central design feature: very limited supported electricity output

The annual supported electricity quantity is limited to the equivalent of 10% of installed capacity operating throughout the year—or 876 full-load hours in a non-leap year. A 1 MW plant therefore has an annual supported-output allowance equivalent to 876 MWh.[8]

Fig. 3 · Supported output cap 876 of 8,760 hours carry EEG support at full load
876 h · 10% 7,884 h · partial-load running or output without the same EEG support
1 MWInstalled capacity
876 MWhSupported output a year
8,760 MWhFull-year baseload equivalent

A plant can operate longer at partial load, or generate additional electricity without the same EEG support. Nevertheless, the commercial incentive is to concentrate supported production into high-value periods rather than operate as a conventional baseload generator.[8] The investment challenge is equally clear: recover the costs of a year-round asset from a relatively small supported electricity volume.

Support adjustments have yet to translate into sustained auction participation

The auction has not always attracted negligible interest. Its first round came close to allocating the entire available volume. Participation then collapsed, followed by several years without successful awards.

Fig. 4 · Auction results, 2021–2026 Capacity offered against capacity awarded, by round
Offered Awarded
160 MW800
150
147.98
152.02
3.499
0 MW awarded
across multiple rounds
60.908
38.024
20.887
6.033
Dec 2021Oct 20222023–2025Apr 2026Sep 2026
Successful bids212063
Share awarded98.7%2.3%—62.4%28.9%
Avg award, ct/kWh17.84Not published—23.0823.12

In 2023–2025, five rounds received no bids. September 2024 received one 2 MW bid, which was excluded. Figures are award volumes, not commissioned capacity. Share awarded is capacity awarded divided by capacity offered. Source: Bundesnetzagentur [9].

The statutory framework expanded to 600 MW annually from 2023, split between April and September. However, the legislation allows the Bundesnetzagentur to reduce the volume offered when undersubscription is expected. The much smaller volumes actually offered in 2026 therefore should not be mistaken for the original annual policy ambition.[10]

Several corrective measures have already been taken.[11]

MeasureBeforeAfter
Bidding regionSouthern region onlyNationwide, from September 2024
Flexibility payment€65/kW/year€100/kW/year, for new 2026 awards
Bid ceiling21.03 ct/kWh23.13 ct/kWh, approximately +10% for 2026

In raising the bid ceiling, the Bundesnetzagentur explicitly recognised that the earlier ceiling was insufficient against expected costs. The April 2026 round was the first biomethane auction applying the Biomassepaket changes following European Commission approval in September 2025.[12]

These changes produced a modest reopening of the market—not a sustained recovery. Across both 2026 rounds, awards totalled 44.057 MW, equivalent to 7.3% of the original 600 MW annual allocation.[9]

Fig. 5 · 2026 awards against the annual allocation 44.057 MW of 600 MW
April 2026 · 38.024 MW September 2026 · 6.033 MW
7.3% of 600 MW
Fig. 6 · All winning projects, December 2021 – September 2026 32 awards across eight states, weighted towards the north-west
Awards by state and round
{{ r.name }} {{ r.count }}

Points are approximate municipality references, not plant locations; awards sharing a locality are fanned out around it. Four localities won awards in both 2021 and 2026: Alfhausen, Thiendorf, Gettorf and Reken. Points are not sized by capacity because the dataset does not give per-award bid volumes for every round. Source: Bundesnetzagentur award lists, 2021–2026 [9].

Trend 1: A few bidders account for most awarded capacity

In October 2022, both awards went to badenova Wärmeplus in Freiburg im Breisgau. In April 2026, SKW Speicherkraftwerk received two awards of 9.999 MW each in Thiendorf, together 52.6% of the round’s awarded capacity. In September 2026, Rasche & Weßler’s award in Alfhausen accounted for 84.4% of the total; the remaining two awards together contributed less than 1 MW.

Fig. 7 · Share of awarded capacity by bidder One bidder dominates each recent round
Oct 20223.499 MW · 2 awards
badenova Wärmeplus 0.999 + 2.500 MW · 100%
Apr 202638.024 MW · 6 awards
SKW Speicherkraftwerk 2 × 9.999 MW · 52.6% Four other awards · 18.026 MW · 47.4%
Sep 20266.033 MW · 3 awards
Rasche & Weßler 5.094 MW · 84.4% Stadtwerke Augsburg Energie 0.539 MW Paul Fischer 0.400 MW

Across both 2026 rounds, the nine awards involved seven named bidding entities. SKW Speicherkraftwerk and Rasche & Weßler together accounted for 62.2% of awarded capacity, measured by the published bidder names rather than consolidated corporate ownership.

Trend 2: Several states are represented, but capacity remains geographically concentrated

The nine 2026 awards span six federal states. However, Saxony and Lower Saxony together account for 73.7% of awarded capacity: 19.998 MW in Saxony, entirely from SKW’s two Thiendorf awards, and 12.488 MW in Lower Saxony, across Berge and Alfhausen.

Fig. 8 · 2026 awarded capacity by federal state Two states hold 73.7% of 44.057 MW
Saxony
19.998 MW · 45.4% Lower Saxony
12.488 MW · 28.3% Schleswig-Holstein and North Rhine-Westphalia
10.632 MW · 24.1% Bavaria
0.539 MW · 1.2% Baden-Württemberg
0.400 MW · 0.9%

Schleswig-Holstein (Gettorf) and North Rhine-Westphalia (Reken) are combined: the 2026 total less the four other states. Shares of 44.057 MW awarded across both 2026 rounds.

Bavaria and Baden-Württemberg appear in September’s winning list, but their combined 0.939 MW represents only 2.1% of the 2026 total. The addition of Augsburg and Untermarchtal therefore broadens the location count much more than the capacity distribution.

The government’s published EEG 2027 bill proposes ending the dedicated biomethane auctions from 2027. This is a prospective legislative change, not the framework under which September’s awards were made.[2]

Government · EEG 2027 bill

Ends dedicated auctions from 2027. Its stated rationale combines poor participation with the expectation that biomethane will increasingly be needed in other sectors.[2]

Bioenergy associations

Oppose abolition and call for either continued, redesigned auctions or transitional protection for projects already developed or demonstrably under development. Their position is that poor auction design, rather than a lack of useful applications, explains the weak pipeline.[13]

September 2026 winners

The bill’s general grandfathering approach would preserve the previous framework for awards associated with bidding dates before 1 January 2027, subject to specified exceptions.[2]

Abolishing future auctions should therefore not be described as automatically cancelling September’s awards.
06 — Policy verdict

Higher-value outlets may lie outside power generation

Germany’s transport greenhouse-gas quota and developing renewable-gas requirements for heating could create higher-value outlets for eligible biomethane than sales into power generation, potentially improving producer economics. Whether these markets support new investment will depend on quota prices, sustainability eligibility and credible long-term offtake, with the still-pending heating-sector green-gas quota leaving a material part of the future demand framework unresolved.